New Albany Stormwater

Armstrong bend

Recently, a large weight bearing culvert pipe was found to be deteriorated in such a manner that replacement was the only solution. After careful review from the Storm water coordinator, and the Storm water board, it was decided that the pipe needed to be replaced. The existing culvert pipe was replaced with a modern style ADS pipe to limit future possibilities of deterioration. Also, the roadway was widened to allow for motorist to safely cross over the intercept of the culvert pipe and roadway. The Storm board would like to thank Cristiani Excavating for performing the work in such a manner that the roadway was only closed one day, and in such a manner that allowed the local residents to carry on in a normal fashion during the project. 

Please click on any of the pictures to enlarge for viewing* 

imageimage1img-20130107-00050img-20130107-00052img-20130122-00056img-20130122-00059img-20130122-00063img-20130122-00060img-20130122-00061

 

City Links

State & Federal Links

Contact Us

Stormwater Utility:
Joseph Ham
Stormwater Coordinator
812-945-1989
2113 Grant Line Road
New Albany, IN 47150

StormWater billing
812-948-5399
After hours please call
Phil Aldridge
Field Supervisor
812-697-3429
Travis Miller
Supervisor
502-558-1507