913 Pennwood

Continued efforts concerning the Castlewood area includes rerouting a portion of the existing pipe system. The existing 21″ R.C.P (reinforced concrete pipe) was replaced with 24″ A.D.S. pipe. Included with the up scaling of the existing pipe line was the installation of three new Storm boxes. These boxes are intended to allow for optimal flow through the system and aid in collection of surrounding area drainage run off.